On 5-4-2011 Vector Engineering presented two basic plans for the future Zuni Blvd. The two basic options are:
1. No change to lanes, limited improvement of lighting and sidewalks, or
2. Reducing lanes by one, and creating left turn lanes, medians, more landscaping, and better sidewalks and lighting. This is what they will propose at the final meeting public meeting #3 “early July”.
A PDF of their Powerpoint presentation is here for review: Zuni Public Meeting 2-05-04 Presentation Slides.
Thanks to Cheryl Harris for attending!